Workshop manual

Mainshaft Assembly

Index

Shop Manual 1999 · source: HRV_Workshop_Manual.pdf, PDF page 501 (manual page 13-27)

PDF p. 501 · 13-27

NOTE: The 3rd/4th and 5th synchro hubs and the ball bearing are installed with a press.

OIL Prior to reassembling, clean all the parts in solvent, dry them and apply lubricant to any contact surfaces. The 3rd/4th and 5th synchro hubs, however, should be installed with a

press before lubricating them.

Illustration: SYNCHRO RING Inspection, (See page 13-41); SYNCHRO SPRING; 3RD/4TH SYNCHRO HUB Inspection, (See page 13-40); 3RD/4TH SYNCHRO SLEEVE Inspection, (See page 13-40); SYNCHRO SPRING; SYNCHRO RING Inspection, (See page 13-41); 3RD GEAR Inspection, (See page 13-28) and (See page 13-41); NEEDLE BEARING Check for wear and operation; MAINSHAFT Inspection, (See page 13-30); NEEDLE BEARING Check for wear and operation; BALL BEARING Check for wear and operation; STOPPER RING; TAPER RING; NEEDLE BEARING Check for wear and operation; SPACER COLLAR; SYNCHRO RING Inspection, (See page 13-41); SYNCHRO SPRING; 5TH SYNCHRO HUB Inspection, (See page 13-40); 5TH SYNCHRO SLEEVE Inspection, (See page 13-40); SYNCHRO SPRING; SYNCHRO RING Inspection, (See page 13-41); 5TH GEAR Inspection, (See page 13-29) and (See page 13-41); SPACER COLLAR Inspection, (See page 13-28) and (See page 13-41); 4TH GEAR Inspection, (See page 13-28) and (See page 13-41)
  1. 1. SYNCHRO RING
    Inspection, (See page 13-41)
  2. 2. SYNCHRO SPRING
  3. 3. 3RD/4TH SYNCHRO HUB Inspection, (See page 13-40)
  4. 4. 3RD/4TH SYNCHRO SLEEVE Inspection, (See page 13-40)
  5. 5. SYNCHRO SPRING
  6. 6. SYNCHRO RING
    Inspection, (See page 13-41)
  7. 7. 3RD GEAR
    Inspection, (See page 13-28) and (See page 13-41)
  8. 8. NEEDLE BEARING
    Check for wear and operation
  9. 9. MAINSHAFT
    Inspection, (See page 13-30)
  10. 10. NEEDLE BEARING
    Check for wear and operation
  11. 11. BALL BEARING
    Check for wear and operation
  12. 12. STOPPER RING
  13. 13. TAPER RING
  14. 14. NEEDLE BEARING
    Check for wear and operation
  15. 15. SPACER COLLAR
  16. 16. SYNCHRO RING
    Inspection, (See page 13-41)
  17. 17. SYNCHRO SPRING
  18. 18. 5TH SYNCHRO HUB
    Inspection, (See page 13-40)
  19. 19. 5TH SYNCHRO SLEEVE Inspection, (See page 13-40)
  20. 20. SYNCHRO SPRING
  21. 21. SYNCHRO RING
    Inspection, (See page 13-41)
  22. 22. 5TH GEAR
    Inspection, (See page 13-29) and (See page 13-41)
  23. 23. SPACER COLLAR
    Inspection, (See page 13-28) and (See page 13-41)
  24. 24. 4TH GEAR
    Inspection, (See page 13-28) and (See page 13-41)